API usage for Gemini 3.8-flash for handling our orders in the prod ENV are not working.
Our system running in production are having an extremely hard time getting responses from 3.8-flash. We get 429 Exhausted almost all the time. We have done all possible to mitigations, exponential backoff, using the “global” so Google can choose where the requests go - be no matter what its mostly unusable.
Our whole order pipeline is relying on this to be a least a little stable Any information when things will be stable again ??
We’re experiencing the same problem. Unfortunately, we’ve been embarrassed in front of our customers. Google has completely crashed. It can barely handle one task in a day. 3.8 Flash
3.8 Flash continues to be unstable.
Since October 21 (Japan Time), 3.8 Flash has been experiencing frequent processing delays,
and errors such as 429 and SSL: UNEXPECTED_EOF_WHILE_READING have been occurring frequently up until today, October 24.
We cannot operate under these conditions.
We are using the Gemini Enterprise Agent Platform, and “Thinking” is always set to “low.” We hope this issue will be resolved soon.
Using Gemini 3.8 Flash in the Gemini Enterprise EU region and getting constant timeouts all day. After burning money on the Claude failover for half a day, we switched to the little used 3.7 Flash and things are suddenly fast again.
Maybe the infrastructure running 3.8 is temporarily (I hope) overloaded?
Anything official from Google on this?
Guess we’ll stay on 3.7 tomorrow and dip our toes in 3.8 again Wednesday morning, with 3.7 on standby.
Gemini 3.8 Flash continues to experience instability
Environment and Settings:
Vertex AI (Gemini Enterprise Agent Platform)
location=global, thinking=low
Issue:
Extreme slowness, timeouts, and frequent 429 and 503 errors
Duration of Issue:
Ongoing from October 21, 2026 (JST) through today, October 28, 2026
Although it occasionally returns to normal, this is not acceptable for operational use.
Measures such as retries have already been implemented When will this be resolved? Since Flash is scheduled to be discontinued on January 28, 2027, and the recommended successor is version 3.8, I’ll be in serious trouble if this isn’t resolved soon.
Downgrading to version 3.5 isn’t a real solution.
As of the morning of October 30, 2026, Japan Standard Time, the UNEXPECTED_EOF_WHILE_READING
error is still occurring frequently, making it impossible to operate the system.
This does not occur in 3.7 Flash . This situation has been ongoing for more than 10 days.
When will the resource shortage in Flash 3.8 be resolved?
Thanks for the follow-ups. Timeouts and 503 errors happen when our services are temporarily overloaded. Please see this pinned post for suggestions on how to handle this, including retrying with exponential backoff.
If you are calling Gemini 3.8 Flash through Vertex AI or the Gemini Enterprise Agent Platform (for example with location=global), please contact your sales representative if you have one. Otherwise, you can find more relevant assistance on the Google Cloud Forum.
Thank you for your reply.
Compared to the period from October 21 to around October 27, the situation has improved slightly, but
when switching from Gemini 3.6 (location=global, thinking=minimal) to 3.7 (location=global, thinking=low) or 3.8 (location=global, thinking=low), not only does the processing time increase significantly, but the frequency of timeouts, 429 errors, and 503 errors also rises.
> when our services are temporarily overloaded.
It would be fine if this were truly “temporary,” but I believe it has become a persistent issue.
I’ve referred to the following resources and have already implemented all possible countermeasures.
https://discuss.ai.google.dev/t/handling-429-503-errors-from-the-gemini-api/124640#p-234342-h-503-errors-4
I believe this issue cannot be resolved unless Google’s resource shortage is fundamentally addressed.
When do you expect the resource shortage to be resolved ?